Eliza Yard and Jersey Wharf, Manchester, UK

Sakthy Ram / 15 January 2026

Eliza Yard and Jersey Wharf, Manchester, UK

illbruck products deliver high-performance solutions for modern residential development

The Project

Eliza’s Yard and Jersey Wharf is a major new-build development in Manchester, comprising 316 residential apartments across three blocks along the Manchester Ship Canal. Designed for both private purchase and rental, the development also includes commercial spaces, landscaped outdoor areas, and amenities such as a gym.

Commissioned by Manchester Life, the project was designed by PRP Architects, with main contractor John Sisk overseeing the build. Installation works were carried out by Rapidfix Ceilings and Partitions, with additional breather membrane installation by Britplas.

The Solution

To meet stringent fire and building regulations, illbruck ME481, ME060, and ME055 were specified for their high performance, reliability, and ease of installation.

  • ME481 Interface Seal – applied at board-to-slab joints, self-adhesive and Class B rated, preferred by Rapidfix for quick and secure installation.
  • ME060 Class A Vapour Control Layer (VCL) – installed internally with ME355 sealing tape, achieving an A2 rating, exceeding standard requirements.
  • ME055 Breather Membrane – installed externally with ME356 sealing tape, delivering a minimum A1 fire classification, meeting all project safety requirements.

These products ensured the building envelope was fully protected while enabling rapid, accurate installation.

Application & Performance

The illbruck systems were selected for their combination of high performance, certified fire ratings, and site efficiency. Rapidfix valued the self-adhesive ME481 Interface Seal, while the ME060 VCL provided peace of mind with an A2 rating, exceeding regulatory requirements.

The breather membrane system ensured compliance with fire and safety standards, while also maintaining structural flexibility and long-term durability. Full site support, toolbox talks, and training helped ensure correct application and optimal results.

The Tremco CPG UK Advantage

As part of Tremco CPG UK, illbruck provides a portfolio of high-performance sealing and fire-stopping solutions. Customers benefit from:

  • Fully accredited and tested products that meet fire and building regulations.
  • Technical support from industry experts throughout the project lifecycle.
  • Training and on-site support, including practical and theory-based sessions.
  • Integrated solutions, leveraging Tremco CPG UK’s broader product range, including Flowcrete, Tremco, Vandex, Nudura, Dryvit, and Nullifire.

By combining high-performance products with expert support, Tremco CPG UK ensures that every project achieves its design, safety, and operational goals.

Completion Date : 31 October 2025
Installation Duration: Approximately 7 months